1 |
Saadiyat island marina
And ferry terminal
|
Scope of work 1. Two roro for ferries and landing craft.
2. Slipway
3. Floating dock for small boats
|
Marine works |
Completed |
Abu Dhabi Ports |
2 |
Rabdan marina |
Scope of works
1. Slip way with 15 m width
2. Floating pontoon for berthing small boats
|
Marine works |
Completed |
Abu Dhabi Ports |
3 |
Jebel Al Dhanna Marina |
Scope of works
1. Slip way on the southern side .
2. Waiting pontoon.
3. Fueling pontoon
4. Jetty ferry terminal
|
Marine works |
Completed |
Abu Dhabi Ports |
4 |
Al Rumaitha Facility |
Scope of work 1. Design of 100 person mosque . 2. Design all infra structure works roads , power supply , water network, irrigation and sewerage network . |
Buildings and infra works |
Completed |
ADNOC |
5 |
Al Dhabyia Facility
|
Scope of work
1. Design of 300 person mosque .
2. Design all infra structure works roads , power
Supply , water network, irrigation and sewerage
Network |
Buildings and infra works |
Completed |
ADNOC |
6 |
Al Alya Ferry Terminal |
Scope of work
1. Two ro ro ramps for ferries and landing craft .
2. Rock edge protection around southern side of
Development
|
Marine Works |
Completed |
Abu Dhabi Ports |
7 |
ADNOC Onshore Construction Office - BAB Habshan |
SCOPE OF WORK
• Detailed Design
• Shopdrawings
• Authorities Approval
• Tie-in: ADDC / ADSSC ADNOC / ETISALAT
• Structural Calculations
• Infra structure design
• Technical support including ( Material, Planning & Quantity Surveyor Works)
• BIM Modelling (Revit Modelling) |
Buildings and Infra Works |
Completed |
EPC |
8 |
BATCH II NEB Project |
SCOPE OF WORKS • Mobilization of Competent resources to carry the works
• Check, advise and modify the drawings.
• Provide value added Engineering and Consultancy concepts |
Infra Works |
Completed |
EPC |
9 |
Earthworks at wic-42 & well areas |
SCOPE OF WORKS •Preparation of Method Statement of each stage of works. •Preparation of Risk Assesment & Time Schedule •Preparation of Working drawings and getting approvals from client. •Advise and attend site testing with third party •Provide full Supervision Team for the site works |
Infra Works |
Completed |
EPC |
10 |
ASAB Field Development Phase II
(Stage 2) Project |
SCOPE OF WORKS •Detailed Engineering services •Developing engineering deliverables |
Oil and Gas |
Completed |
EPC |
11 |
Consultancy and Professional Services Agrement For Technical Support Services (TSSA) |
SCOPE OF WORKS •Frame Agrement for 4 + 2 years •Professional Service Supply •Engineering Services for Design |
Oil and Gas |
On Going |
ADNOC |
12 |
Technical service for engineering projects in medc(2023 ~ 2025) |
SCOPE OF WORKS Professional Service supply |
Oil and Gas |
On Going |
EPC |
13 |
Consultancy and Professional Services Agrement For Technical Support Services (TSSA) |
SCOPE OF WORKS •Frame Agrement for 4 + 2 years •ProfessionSErvicer Supply •Engineering Services for Design |
Oil and Gas |
On Going |
ADNOC |
14 |
Provision of support for 3D modelling |
SCOPE OF WORKS •Detailed Engineering services •Developing engineering deliverables |
Oil and Gas |
On Going |
EPC |